Before mounting the sensor
Integration rarely fails because of one datasheet number. Blockers usually come from overlooked details: weak power supply, inaccessible connector, missing network IP plan, absent timestamping or approximate mechanical calibration.
Goal: obtain a stable, recorded and replayable first point cloud before judging perception performance.
Preparation checklist
| Area | Check | Expected evidence |
|---|---|---|
| Mechanical | Mounting, orientation, vibration, cleaning access | Mounting plan + photo of real setup |
| Environment | IP rating, temperature, dust, rain, direct sun | Representative test scenario |
| Power | Voltage, current peaks, thermal margin | Measurement at startup and during operation |
| Network | IP, throughput, cable, connector, switch | Bandwidth capture or monitoring |
| Data | Format, intensity, timestamp, frame rate | Replayable raw file or rosbag |
| Synchronization | PTP, GNSS, PPS or system clock | Measured and documented time offset |
Mechanical and environmental
- Check that the sensor does not see part of the chassis.
- Plan optical cleaning, splash protection and maintenance access.
- Test vibration with the robot moving, not only on a bench.
- Document the exact mounting angle for extrinsic calibration.
Data and validation
The first validation must be measurable. Define a few simple scenes: low obstacle, dark obstacle, narrow passage, turn, vibration, strong light. For each scene, record detection distance, point-cloud stability, false positive rate and processing delay.
Minimum deliverable before advanced prototyping: wiring diagram, network configuration, replayable raw file, sensor settings, acceptance criteria and list of known limits.