Before mounting the sensor

Integration rarely fails because of one datasheet number. Blockers usually come from overlooked details: weak power supply, inaccessible connector, missing network IP plan, absent timestamping or approximate mechanical calibration.

Goal: obtain a stable, recorded and replayable first point cloud before judging perception performance.

Preparation checklist

Area Check Expected evidence
Mechanical Mounting, orientation, vibration, cleaning access Mounting plan + photo of real setup
Environment IP rating, temperature, dust, rain, direct sun Representative test scenario
Power Voltage, current peaks, thermal margin Measurement at startup and during operation
Network IP, throughput, cable, connector, switch Bandwidth capture or monitoring
Data Format, intensity, timestamp, frame rate Replayable raw file or rosbag
Synchronization PTP, GNSS, PPS or system clock Measured and documented time offset

Mechanical and environmental

  • Check that the sensor does not see part of the chassis.
  • Plan optical cleaning, splash protection and maintenance access.
  • Test vibration with the robot moving, not only on a bench.
  • Document the exact mounting angle for extrinsic calibration.

Data and validation

The first validation must be measurable. Define a few simple scenes: low obstacle, dark obstacle, narrow passage, turn, vibration, strong light. For each scene, record detection distance, point-cloud stability, false positive rate and processing delay.

Minimum deliverable before advanced prototyping: wiring diagram, network configuration, replayable raw file, sensor settings, acceptance criteria and list of known limits.